Skip to product information
Safety Wash Bottles, Vol.500ml, 6PCS of Lab Rinse Squeeze Bottles, Printed Acetone, Ethyl Alcohol, Methanol, Isopropanol, Distilled Water, Sodium Hypochloride, LDPE Material, IN-WBS001
$65.98 USD
Product Details
About This
- Capacity: 6pcs of 500ml (17oz), each 1PC of acetone wash bottle , Ethyl alcohol wash bottle , Methanol wash bottle, Isopropanol wash bottle, Distilled water wash bottle and Sodium hypochloride wash bottle.
- O.D×Height: 2.91’’×7.2’’(74mm×183mm), the diameter of mouth is 1.36’’ (34.5mm)
- Material: Bottle is made of LDPE(Low Density Polyethylene) material which has good flexibility, elasticity, and impact resistance, draw tube is made of PP(Polypropylene).
- Superiority: High sealing performance, effectively prevent the volatilization of liquid
- Appearance: These wash bottles have a label with chemical name, the chemical formula of the International Chemical Society (ICS) and the Chemical Abstract Service (CAS) number.
Overview
- Brand : LABINVO
- Material : Plastic
- Bottle Type : Wide mouth bottle
- Color : Safety Wash Bottles, 6PCS
- Capacity : 500 Milliliters
Care & Maintenance
To maintain the beauty and integrity of your purchase, we recommend treating it with care. Simple maintenance practices, such as gentle washing and proper storage, can effectively preserve the longevity of your favorites. We encourage you to refer to the care instructions included with each item, designed to help you keep your purchase in top condition.
Size & Fit
Our products are crafted to fit true to size, ensuring that you can confidently select your usual size with ease. Whether you’re looking for a relaxed or tailored fit, our designs are made to complement your unique shape and style.